Power flushing completion certificates
Kamco power flushing completion certificates enable
heating engineers to leave customers with a professional
looking certificate of completion after the job has been
finished.
They give reassurance to the householder that the work
has been carried out thoroughly and leave them with
information they need on what chemicals have been used,
and which corrosion inhibitor was left in the system.
Building regulations, and boiler manufacturers now insist
on the use of a Buildcert approved inhibitor.
The certficate confirms that the heating engineer has complied with these
requirements.
As boiler manufacturers extend the length of boiler
warranties, it is probable that the extended boiler warranty
will be conditional on system treatment, and an annual
check that the heating system has sufficient inhibitor
present.
Each certificate has an NCR paper copy left in the bound
pad, so that engineers have an easy to retain record of the
heating system details and when the work was carried out.
A comments section has room for engineers to detail
further work recommendations if design problems have led
to the need for a power flush.
Supplied in pads of 30 certificates.
Technical Specifications
Manufacturer Part Number |
H030F40
|